Construction of an Elevated Water Tank in Talia
CSP is resolving the water crisis in Talia by constructing an elevated water tank of a capacity of 300m³ and rehabilitating the existing operation room, including but not limited to electrical, mechanical, and chlorination systems, as well as protecting the available cables and transformer, and supplying the fire extinguishers.
Location
Talia, Beqaa
Status Ongoing
Status Ongoing
Beneficiaries
4,500