Construction of a Rainwater Drainage System in Kfaryashite and Bisebaal
![USAID Logo in Blue and Red](https://csplebanon.org/wp-content/uploads/2021/02/Mask-Group-1@2x-1.jpg)
CSP is supporting the municipality of Kfar Yachit/Bisbeel through the installation of a new rainwater collection system that consists of a 760m long pipe along with around 19 manholes on the side of the Kfar Yachit and Bisbeel main roads.
Location
Kfaryashite/Bisebaal, North
Status Ongoing
Status Ongoing
Beneficiaries
3,800