Constructing a Sewage Network in Haret El Fouwar
CSP is constructing a 1000-meter sewage line (10-inch wide with manholes every 25 meters) to connect a major neighborhood with around 270 households to the main sewage line linking Haret El Fouwar to the Tripoli Wastewater Treatment Plant.
Location
Haret el Fouwar, North
Status Ongoing
Status Ongoing
Beneficiaries
8,700